Project for the execution of an electronic protection system of the electric transformer stations (substations) 220/30 KV
The project consists in the execution of the supply and installation of an electronic protection system at the substations 220/30 KV (Bab Alazizia – Esserraj – Alwatania – Ain Zara – Suk Aljumaa). It includes the execution of the following works:
- CCTV system
- Access control system
- Intrusion system
- Main security gate
Project data:
Work order No: 6124/8/4
Dated: 08/07/2010
Total amount: 665,000.000 LD
Owner body: General Electricity Company
Firstly: the CCTV system
It consists in the installation of night and day control cameras type (Honeywell) with lenses of variable focal length, protected by an external cover protecting it from weather conditions, it includes also fixed spherical cameras and mobile external cameras, with a control device controlling the surveillance, width and data storage.
Secondly: Access Control system
It includes the control board, cards reader for controlling the access, exit button, electric locking with a locking arm and standby power supply.
Thirdly: Intrusion system
It includes a control board, internal and external sirens, alarm phone connection device through a phone system, and it includes also motion detectors.
Fourthly: Main security gates and its accessories
It includes a mobile metallic gate, of length 6 meters, of capacity 1500 kg , with all remote control devices to open and close the gate.
The said project execution was completed, and it was received in a preliminary receipt by the owner, and we are in the process of completing the final receipt procedures.